Eyes and hands on the smart energy network

The Energy Transition in the Netherlands puts pressure on the existing electricity network. Combined with, on average, 40 year old stations throughout the system the transport and distribution network operators face a huge challenge to overhaul the current stations. Simultaneously to maintain the current high reliability and improve the agility further the current stations also need to be monitored and controlled from a central control center.

Dynniq designs, delivers, installs and puts into operation High Voltage, Medium Voltage and Low Voltage stations and Mid Voltage and Low Voltage connections.

In close cooperation with our clients, the network operators, Dynniq executes projects as a system integrator and delivers together with multiple partners stations and network connections.

 

Smart Meters in every home

The Dutch governments has the goal to increase consumer awareness of energy usage in their homes. With smart meters in every home consumers will get real time insights in their usage. At the same time the Distribution Network Operators will develop a database on a regional level to understand, predict and thereby supply sufficient energy for the near future. The Distribution Network operators have been tasked to install smart energy usage meters in every home in Netherlands.

Dynniq installs smart meters on behalf of the clients in a full service model; including planning, customer relations, staff planning, and customer satisfaction. We manage program, execute planning and dispatch, train field engineers, monitor engineers and report to client.